LOW-IMPEDANCE/SECOND HARMONIC CAVITY COLLABORATION
Participating Laboratories
Argonne National Laboratory, USA
STFC
Rutherford Appleton Laboratory, UK
High
Energy Accelerator Research Organization, Japan
Collaboration meeting
1st
July 18, 1996 (RAL), 2nd
February 24-25, 1998 (KEK), 3rd June 25, 1998 (Stockholm City
Conference Centre)
4th February
22-23, 1999 (RAL), 5th
November 4, 1999 (ANL), 6th October 16, 2000 (KEK)
7th August 5-7,
2002 (KEK), minutes May 1, 2003 (RAL) , 8th July 4, 2003
(RAL),
minutes
March 24-26, 2004 (RAL) , 9th
June 14-15, 2004 (ANL), minutes August 19-26, 2005 (RAL) ,
10th
February 14, 2007 (videolink
ANL/RAL), 11th June 26, 2007 (Albuquerque
Convention Center),
12th January 18, 2008
(Cosener's House+teleconference to ANL),
13th October 13, 2017
(RAL).
Participants
List
Photo's
photo
1-5:
(October, 2000) power supply for final tube arrived at KEK from ANL
photo 6-9:
(October, 2000) cavity and bias supply arrived at KEK from ISIS
photo 10-13:
(March 2001) Low-output-impedance amplifier with cavity
photo 14-17:
(August 2002) 7th
collaboration meeting
photo 18-20:
(February-March 2003) Shipping to ISIS
photo 21-24:
(July 2003) 8th
collaboration meeting
photo 25:
(June 2004) 9th
collaboration meeting
photo 26-46:
(November-December 2004) Preparations at MICE Hall (Phase I)
photo 47-68:
(August 2005) Experiments at MICE Hall (Phase I)
photo 69-75:
(November-December 2006) Move to Hall 2
photo 76-84:
(February 2007) LOI at Hall 2
photo 85-98:
(January 2008) LOI at Hall 2
photo 99-115:
(May-June 2008) LOI at Hall 2
photo 116-125:
(August 2008) LOI at Hall 2
photo 126-129:
(March 2009) BR capacitors replaced (Hall 2)
photo 130-141:
(October 2009) LOI at Hall 2
photo 142-151:
(January 2010) LOI at Hall 2
photo 152-166:
(November 2010) LOI at SP6
photo 167-173:
(February 2011) Ready for Beam at SP6
photo 174-176:
(April 2011) Beam at Last
photo 177-181:
(June 2011) LOI at SP6
photo 182-206:
(February 2012) LOI at SP6
photo 207-216:
(September 2012) Reaching 10kVp at SP6
photo 217-219:
(August-September 2013) Water Meadows
photo 220-222:
(October 2017) 13th
collaboration meeting
visit 1:
(May 2007) J-PARC and KEK
visit 2:
(June 2009) J-PARC and KEK
visit 3:
(March-April 2010) ISIS
visit 4:
(January 2011) J-PARC and KEK
Progress
Notes
January,
2003 output impedance, RF voltage with
swept frequency
May-Jun, 2004 WPR000, WPR001, WPR002, WPR003, WPR004, WPR005, WPR006, WPR007
Jul -Sep, 2004 WPR008, WPR009, WPR010, WPR011, WPR012, WPR013
Oct-Dec, 2004 WPR014, SUMMARY
Aug-Sep, 2005 LOI-01,LOI-02
Nov-Dec, 2006 LOI-03
February, 2007 LOI-04
June, 2007 see
11th
Collaboration
meeting (June 26, 2007)
January, 2008 see 12th Collaboration
meeting (January
18,
2008)
May-Jun, 2008 memo
August, 2008 LOI-05
October, 2009 LOI-06
January, 2010 LOI-07
September, 2010 LOI-08
November, 2010 LOI-09
February, 2011 LOI-10
April, 2011 LOI-11, Article @ISIS website, Article @KEK website
June, 2011 LOI-12
February, 2012 LOI-13
September, 2012 LOI-14
Aug-Sep, 2013 LOI-15 Double-peak bunch structure
Position paper
kek
isis anl position paper
Staff
members
Important
Notes
Travels
for this
collaboration have been supported by the Grants-in-Aid for Scientific
Research by the Japan Society for the Promotion of Science (JSPS) and
the Travel Grant by the British Council.
last
update: March 8, 2021
For more
information, mail to
rlk@aps.anl.gov
(ANL), john.thomason@stfc.ac.uk
(ISIS), yoshiro.irie@kek.jp
(KEK).
KEK Accelerator Laboratory