Status of major works
    Status  
Items of works Finished In progress Scheduled
Construction and extension of buildings X    
Modification of RFQ/IH linac X    
Installation of:       
  RFQ/IH linac X    
  charge breeder X    
  rf power supplies X    
  magnet power supplies X    
  cooling water circulators X    
Assembly of beam transport sections X    
Piping for cooling water X    
Wiring for:      
  rf power supplies X    
  magnet power supplies X    
  cooling water circulators X    
  control system   X  
Test for:      
  rf tuning of cavities   X  
  high power aging of cavities     X
  beam acceleration     X
Last updated. August 3, 2004.