J-PARC Hadron Experimental Facility : Runs & Experimental Reports   rev.230831

Run Schedule


Experimental Report

After each run, experimental group has to make the Experimental Report.

  1. Download the form [word]
  2. Send the experimental report with word or pdf format to eppc-hadron [at] ml.post.kek.jp by email.

[Attention]
Maximum email size up to 1MB can be accepted including attached file(s).
For file(s) over 1MB, please send them to masaharu.ieiri [at] kek.jp, separately.


Runs & Experimental Reports of SX

Active links are schedules at each run and submitted experimental report.
A glossary of abbreviations used in files.

Run

Carried out

Run

Original plan

period

mode

experiments

90-2

Case1, Case2

01Apr23-30Jun23

SX(FX)

K1.8(E70, E96), K1.8BR(T98), KL(E14), High-p(E16)

90

-

02Mar23-15Mar23

SX

C-line tuning [for E21]

89

Shutdown for MR upgrade

11Jan22-06Jul22

-

(MLF)

88

15Nov21-15Dec21

-

(Li&RCS beam study)

87

87

10May21-30Jun21

SX

K1.8(E42), K1.8BR(T78, E73), KL(E14), High-p(E16)

86

 

08Apr21-24Apr21

FX

(T2K(E11))

86c

86c

27Mar21-07Apr21

SX

K1.8(E03), KL(E14)

86

 

08Mar21-19Mar21

FX

(T2K(E11))

86b

86b[pdf, xlsx]

08Feb21-03Mar21

SX

K1.8(E03), KL(E14), High-p(E16)

86a

86[pdf, xlsx]

10Dec20-22Dec20

SX

K1.8(E03, E42), K1.8BR(T78), KL(E14)

85

(84p)

23May20-26Jun20

SX

K1.8(E40, E03), K1.8BR(T77), KL(E14), High-p(E16)

84b

84p

12Feb20-01May20

-

-

84a

 

14Jan20-11Feb20

FX

(T2K(E11))

83

 

04Nov19-19Dec19

FX

(T2K(E11))

82

82p

04Apr19-20May19

SX

K1.8(E40), K1.8BR(E57), KL(E14)

81

81p

08Feb19-26Mar19

SX

K1.8(E40), K1.8BR(E57), KL(E14)

80

07Oct18-21Dec18

79

 

01Jun18-30Jun18

SX

K1.8(E40), K1.8BR(E62), KL(E14)

78

 

13Jan18-26Feb18

SX

K1.8(E03, E21, E40), K1.8BR(E31), KL(E14)

77

 

15Nov17-21Dec17

FX

(T2K(E11))

76

 

16Oct17-14Nov17

FX

(T2K(E11))

75

 

19Apr17-03Jul17

SX

K1.8(E03, E07, E40), KL(E14)

74b

 

12Apr17-19Apr17

SX

K1.8(E07), K1.8BR(E31), KL(E14)

74a

 

01Apr17-12Apr17

FX

(T2K(E11))

73

 

08Feb17-31Mar17

FX

(T2K(E11))

72

 

04Jan17-07Feb17

FX

(T2K(E11))

71

 

16Nov16-27Dec16

FX

(T2K(E11))

70

 

03Oct16-15Nov16

FX

(T2K(E11))

69

 

01Jun16-30Jun16

SX

K1.8(E07), K1.8BR(E31, E57/E62), KL(E14)

68b

 

27May16-31May16

SX

K1.8(E07), K1.8BR(E31), KL(E14)

68a

 

04Apr16-27May16

FX

(T2K(E11))

67

 

19Feb16-04Apr16

FX

(T2K(E11))

66

 

07Jan16-18Feb16

FX

(T2K(E11))

65

 

12Nov15-25Dec15

SX

K1.8(E05, E07), K1.8BR(E15), KL(E14), K1.1BR(E36)

64

 

29Sep15-12Nov15

SX

K1.8(E05, E07), K1.8BR(E15), KL(E14), K1.1BR(E36)

63b

 

04Jun15-30Jun15

SX

K1.8(E13), KL(E14), K1.1BR(E36)

63a

 

20May15-03Jun15

FX

(T2K(E11))

62b

 

08May15-19May15

FX

(T2K(E11))

62a

 

01Apr15-07May15

SX

performance test & K1.8(E05&E07&E13), K1.8BR(E15), KL(E14), K1.1BR(E36)

 

 

Renovation

 

Renovation

49c

 

13May13-11Jun13

SX

K1.8(E13), K1.8BR(E15), KL(KOTO), K1.1BR()

49b

 

02May13-13May13

FX

(T2K(E11))

49a

 

27Apr13-02May13

SX

K1.8(E13), K1.8BR(E15), KL(KOTO), K1.1BR(T51)

48

 

01Apr13-12Apr13

FX

(T2K(E11))

47c

 

18Mar13-01Apr13

FX

(T2K(E11))

47b

 

07Mar13-14Mar13

SX

K1.8(E13), K1.8BR(E15), KL(KOTO), K1.1BR(T48(E36), T46, T51)

47a

 

22Feb13-07Mar13

FX

(T2K(E11))

46b

 

17Jan13-22Feb13

FX

(T2K(E11))

46a

 

07Jan13-17Jan13

SX

K1.8(E10), K1.8BR(E15), KL(KOTO), K1.1BR(T47, T48)

45b

 

14Dec12-27Dec12

SX

K1.8(E10), K1.8BR(E15), KL(KOTO), K1.1BR(T47, T48(E36))

45a

 

21Nov12-14Dec12

FX

(T2K(E11))

44

 

17Oct12-12Nov12

FX

(T2K(E11))

43

 

28May12-02Jul12

FX&SX

(T2K(E11)), K1.8(E27), K1.8BR(E15), KL(KOTO), K1.1BR(TREK, T43, T44)

42

 

08Apr12-25May12

FX

(T2K(E11))

41

 

25Feb12-22Mar12

FX

(T2K(E11))

40

 

07Jan12-22Feb12

FX&SX

(T2K(E11)), K1.8(E19), K1.8BR(E15), KL(KOTO)

39

 

09Dec11-27Dec11

FX

start a test run of the beam for accelerators

38

 

02Mar11-28Mar11

FX

(T2K(E11)) stop on 11Mar

37

 

07Jan11-25Feb11

FX

(T2K(E11))

36b

 

16Nov10-27Dec10

FX

(T2K(E11))

36a

 

03Nov10-16Nov10

SX

Beam survey: K1.8BR(E17), K1.8(E19), KL(KOTO), K1.1BR(E06, T38[T38report])

35

 

01Oct10-01Nov10

SX

Beam survey: K1.8BR(E15&E17), K1.8(E19), KL(KOTO), K1.1BR(E06, T25, T32)

34

 

05Jun10-01Jul10

FX

(T2K(E11))

33

 

06May10-01Jun10

FX

(T2K(E11))

32

 

02Apr10-01May10

FX

(T2K(E11))

31

 

18Mar10-25Mar10

FX

(T2K(E11))

30

 

11Feb10-02Mar10

SX&FX

Beam survey: K1.8BR(E15&E17), K1.8(SKS), KL(KOTO)

29

 

11Jan10-05Feb10

SX&FX

Beam survey: K1.8BR(E15&E17), K1.8(SKS), KL(KOTO)

28

 

01Dec09-25Dec09

SX&FX

Beam survey: K1.8BR(E15&E17), K1.8(SKS), KL(KOTO)

27

 

29Oct09-26Nov09

SX

Beam survey: K1.8BR(E15&E17), K1.8(SKS), KL(KOTO)

26

 

01Oct09-23Oct09

SX&FX

Beam survey: K1.8BR(E15&E17), K1.8(SKS), KL(KOTO)

25

 

01Jun09-22Jun09

FX

(T2K(E11))

24

 

11May09-31May09

FX

(T2K(E11))

23

 

01Apr09-30Apr09

FX

(T2K(E11))

22

 

03Feb09-28Feb09

SX

Beam survey: K1.8BR(E15&E17)

21

 

07Jan09-03Feb09

SX

30GeV Protons were successfully extracted to the HD hall.