E06 PAC Presentation

October 2, 2026

Proposal

l  Measurement of T-violating Transverse Muon Polarization in K+→π0 μ+ν Decay (The 1st PAC, July 2006)

 

PAC

l  The 12th PAC (July 8 − 10, 2011)             Agenda      Minutes

Ø  E06 TREK status

l  The 10th PAC (July 16 − 18, 2010)           Agenda      Minutes

Ø  Beam line commissioning of K1.1BR

l  The 9th PAC (January 15 − 17, 2010)      Agenda      Minutes

Ø  E06 status (TREK)

l  The 7th PAC (March 6 − 7, 2009)             Agenda      Minutes

Ø  E06 Status (TREK)

l  The 6th PAC (October 16 − 17, 2008)       Agenda      Minutes

Ø  E06 Status (TREK)

l  The 5th PAC (June 5 −7, 2008)                 Agenda      Minutes

Ø  E06 Status (TREK)

²  Document

l  The 4th PAC (January 7 − 8, 2008)          Agenda      Minutes

Ø  E06 Status (TREK)

²  Document

l  The 3rd PAC (July 6 − 7, 2007)                 Agenda      Minutes

Ø  Status of K0/K0.8 beamlines

Ø  FIFC Report on E03, E06, E10, E14 experiments and the K0, K0.8 beam lines

Ø  E06 (T-violation) status Report

l  The 1st PAC (June 30 − July 2, 2006)      Agenda      Minutes

Ø  P06 Measurement of T-violating Transverse Muon Polarization in K+ → pi0 mu nu Decay