Temperature Monitor (In KEK only)
20080401 Temperature interlock
20071205 Interlock Manual
20071129 Interlock Manual
20071120 Photos for the air compressor.
20071110 Algorithm for setting DAC synchronous..
20070921 Photos for the area interlock.
20070912 Photos for the test for the beam shutter.
20070801 Photos around the beam line.
20070712 First look at the beam shutter
Drawing of the beam line (Tajima)
Drawing of the experiment stage (Tajima)
Drawing of the magnet stage (Tajima)
(User can never accessed to this area when KEKB is operated
20071001 Interlock strategy (rev)
20070620 beam shutter manual
20070625 Shape of the hole for beam extraction
20070711 Background Mesurements
2006 Beam survey Mesurements(2006)